Guides for people who hire contractors.
Each guide answers one question we hear before a job starts: what drives the cost, what needs a permit, what paperwork a building asks for. They are written for facility managers, property managers and homeowners in Utah.
Guides on permits, finish levels, repaints, move-ins and move-outs
Do pallet racks and shelving need a permit in Utah?
Utah rack permit thresholds in plain language: over 5 ft 9 in generally means a building permit, 8 ft stamped engineering, 12 ft of storage fire review.
7 min readTenant move-in checklist for facility and property managers
A tenant move-in checklist for Utah facility and property managers: walls, doors, ceilings, floors, signage, life-safety items and a four-week timeline.
6 min readOffice move-out restoration: what 'original condition' usually means
What 'original condition' usually means when you leave an office suite: typical restoration items, wear and tear versus damage, photos and a sequence.
6 min readDrywall finish levels 0 to 5, and which one your office needs
Drywall finish levels 0 to 5 explained from GA-214: what each level includes, where it belongs in an office, and why patches flash through paint.
6 min readHow to plan an office repaint without closing the office
Plan an office repaint without closing: phasing by zone, night and weekend shifts, low-VOC paint, furniture and IT protection, sheen by area, cost drivers.
6 min readSend the scope. We will send a number.
Tell us what the space needs. You get a written, line-by-line quote within 24 to 48 hours of the site walk.